PART I – GENERAL
1.01 DESCRIPTION
A. Scope of Work
Furnishing of materials of the flooring system described herein, including
the interlocking suspended synthetic (polypropylene high impact copolymer of proprietary
formulation) modular tile system and complete installation thereof, and application of game
lines, as well as maintenance instructions for the system.
B. Related Work Specified
Elsewhere
- Installation of concrete, bituminous, or wood substrate.
- Preparation of substrate to provide a medium dense finish with level tolerances of (+) or (-) ¼” in any 10’ radius.
- Membrane waterproofing as determined by project engineer. NOTE: IceCourt® flooring surfaces are not affected by moisture.
1.02 QUALITY ASSURANCE
A. Acceptable Installer
- IceCourt® shall supervise the flooring installation as per the installation
instructions of the manufacturer.
- Successful bidder must submit a minimum of (3) three completed projects of similar
magnitude and complexity within the last (2) two years. List of projects shall include name,
address, phone number, and contact person.
1.03 STORAGE
A. Storage of Material
- The general contractor shall provide a secure, clean and dry location for storage of
material.
1.04 JOB CONDITIONS
A. Schedule of Installation
- IceCourt® flooring shall preferably not be installed until all other trades are
completely finished in the area
- Substrate shall be level to specified tolerances, free of debris and materials, and
broom-clean.
B. Outdoor Requirements
Substrate shall be coated with silicone material as specified by the manufacturer’s installation guide
1.05 WARRANTY
A. Manufacturer’s Limited Warranty
- IceCourt® flooring shall be warranted by the manufacturer for any defects in
materials and workmanship for a period of 5 years from the date of purchase as set forth in
the manufacturer’s standard limited warranty.
- Manufacturer’s warranty shall include any warping or cupping of any tiles in excess
of 1/32” measured from corner to corner.
PART II – PRODUCTS
2.01 MATERIALS
A. IceCourt Suspended Flooring
- Description: open grid design shall be 9.842” x 9.842” x ½” ( 25cm x 25cm x 12mm),
high impact polypropylene copolymer suspended modules with open support structures for
drainage. The tiles shall tightly interlock, without a physical trace of gaps or ridges.
B. Underlayment
- A rubber underlayment shall not be required for roller hockey, however may be
stipulated as an option for multi-purpose ball games.
C. Line Striping
- Tape
Preferably, a special tape (3M-476) shall be used, which can easily be
replaced every 24 months
- Paint
1. Primer: Recommended primer is DPX 801 by PPG 2. Paint: aliphatic
polyurethane paint
- Ink
For large, colorful logos, special ink is recommended, with a layer of
clear polyurethane paint coating
PART III – PHYSICAL PROPERTIES
3.01 MATERIAL TEST RESULTS
A. Rockwell hardness (ASTM D 785): 74 B. Heat deflection@ 66 psi
(ASTM E 648): 195 C. Melting point isotactic (ASTM D 2117): 305 D. Auto-ignition
temperature (ASTM D-1929): 980° F E. Vicat softening point ( ASTM D-1525): 260° F
F. Low temperature brittleness (ASTM D-2137): -25° F G. Co-efficient of Linear
Thermal Expansion, (ASTM D-696, E-831): 63 x10-6 (in/in) / ° F H. E-Modulus (ASTM D-5418)
126,000 psi (850MPa) I. Flex-Modulus (ASTM D-790) 122,000 psi J. Tensile Yield Strength
(ASTM D-638) 3300 psi K. Elongation at Yield (ASTMD-638) 18% L. Notched Izod
(ASTM D-256) 15 (ft-lbs / in) at 20° C
3.02 PRODUCT TEST RESULTS
A. Flame spread Index (ASTM E-162): 55 B. Smoke Development
(ASTM E-162): 38 C. Radiant Panel (ASTM E-84, 162, 648) .72 Watts/cm²
D. Friction Test (ASTM C-1028) dry < .71 wet < .52 E. Compression vs.
crush (ASTM D-3998): no break F. Noise Reduction Coefficient (ASTM C-423) 25% G.
Rolling Load (DIN 18032) Good H. R-Value < 1.0 I. Flatness +/- 0.02 mm K.
Load Bearing Capacity: > 20,000 pounds per tile.
3.03 SANITARY INFORMATION
A. Resistance to fungi (in compliance with ASTM G-21). Basic organisms
test (ATCC #6205) indicates zero growth.
B. Resistance to the following:
- Bacteria and mildew resistance
- Gram-positive bacterial Staphylococcus Aureus
- Gram-negative Klebsiella Pneumoniae
- Pink-staining organism.
- STV Reticulum
- Surface fungi growth prior to and following leaching
PART IV – EXECUTION
4.01 INSPECTION
A. Substrate
- Substrate shall be checked for contamination, dryness, and levelness. Substrates with
structural failures shall be prepared insofar as to prevent tiles from catching on sharp
cracks and ridges.
4.02 INSTALLATION
A. IceCourt Suspended Tile Flooring
- Floor will be installed to pre-approved layout.
- Floor will be installed and/or supervised to manufacturers specifications by an
authorized, factory trained dealer or representative.
B. Game Striping / Lining
- Floor surface shall be clean and free of debris.
- Lines shall preferably be taped using special 3M tape, or primed and painted using
PPG’s DPX801 primer and a recommended aliphatic polyurethane paint.
4.03 MAINTAINANCE
A. Maintenance Procedure
- Flooring contractor shall provide detailed care and cleaning procedures on
videocassette.
- Flooring contractor shall provide a list of materials needed for proper care and
maintenance of floor.
- Flooring contractor shall provide a recommended tool for disassembly and reassembly.
|